For the needs of JSC ELEM - Power Plants of Macedonia, during the annual repair of the thermal power plant REK Oslomej was performed an internal cleaning of the pipes from the canals of pumps (ADR Vakumpress 900m3/h), cleaning of ceilings and boiler from burned ash, in quantity of 350 tons, with pneumatic pump and specially Vakumppress vehicle; Cleaning Above the ceiling, troughs around the boiler, paragliders and channels from the collected ash, in the quantity of 150 tons, Cleaning tubes from the condenser, sealing with a water pump of 700 bar.