For the needs of JSC ELEM - Power Plants of Macedonia, as part of the annual repairs of the thermal power plant REK Bitola, cleaning of ash from a boiler - hot box on block 2 was carried out in the quantity of 156 m³ with a special Vacuum truck - tank.

Cleaning of amphitheatres, pool of cooling tower, circus pipelines, oil tanks and tubs, GPO and platforms, pumping and electro filters were performed.

 

Benefits

01

The works are carried out in a certain period and in a reliable way

02

The whole waste is complied with the existing legal regulations