This project was part of the “Preparatory Research for the Project for Improving the Sewerage of Ohrid Lake – Macedonia”, which was established by the Japan International Agency (JICA Survey).

The following activities have been carried out:

  1. Hydrodynamic penetration and cleaning of the secondary network in the cities of Ohrid and Struga with a total length of 3,434.75 m with a special vehicle and equipment
  2. Hydrodynamic penetration and cleaning of the collector system with a special high pressure vehicle and equipment in the cities of Ohrid and Struga with a total length of 7,301.27 m
  3. CCTV video inspection of the sewerage network in a total length of 10 .736,02 m
  4. Preparation of detailed written and video documentation in accordance with the standard EN 13508-2 for the performed CCTV video inspection.

Benefits

01

possible reasons for creation of unidentified waste water flow are foreseen, in order to improve the functioning of the sewage system in the Municipalities of Ohrid and Struga, including wastewater treatment for communal services

02

All the activities are completet for a very short period of time in accordance with the requirements of the Client

Back to the reference list